Data insight to analyse the root causes of losses and drive Continuous Improvement efforts

Tick Icon

Increased operator engagement with the system and Continuous Improvement activities

Tick Icon

Critical information available on large overhead displays to identify issues and highlight opportunities for improvement

Tick Icon

Increased Overall Equipment Effectiveness (OEE) by 20% since the initial system implementation

Tick Icon

Historical analysis reports on rate efficiency and pareto charts for measuring breakdowns

Purity Soft Drinks’ Challenges

  • Inaccurate performance data from a manual data collection system.
  • Information was not readily available to everyone within the production team.
  • Processing the raw data was extremely time consuming.
  • Lack of visibility to identify areas of improvement.

Purity Soft Drinks’ Requirements

  • Replace their existing paper based model to measure plant efficiency.
  • Provide a flexible system to collect the data defined as critical by the plant (particularly to minimise operator workload on downtime justifications).
  • Provide actionable insight into production losses and their root-causes and take action.
  • Measure Overall Equipment Effectiveness (OEE) in real-time to increase throughput and overall performance.

Continuous improvement journey

ITI Group helped Purity Soft Drinks to embark on a true Continuous Improvement journey.

In addition to solving all of Purity Soft Drinks’ challenges, ITI Group’s Performance Management solution provided significant benefits, including:

Tick Icon

Monitoring throughput, speed, and all stoppages, as well as calculating OEE and its components: Availability, Performance and Quality

Tick Icon

Automatic data collection of machine production counters, machine status and main downtime reasons

Tick Icon

Communication via the PLCs of the different machines in use on the PET (Polyethylene Terephthalate) line, such as the Blower, the Filler, the Labeller, the Sleever and the Palletiser

Tick Icon

Business-wide OEE provides the production team with actionable insight and intelligence into line efficiency while enabling them to achieve their production goals

Ongoing Success

ITI Group enabled Purity Soft Drinks to effectively analyse losses, determine route cause(s) and take action.

Within three months, Purity Soft Drinks saw an OEE average increase of 4%, which equated to an extra 400 cases per shift.

In just under three years since the initial implementation of the Performance System, Purity Soft Drinks achieved an OEE improvement of nearly 20%.

How we’ve helped other businesses like yours

Power & Utilities

Hayley Engineering Services Vibration Alert System

AssetMinder (Part of the ITI Group), implemented a Condition-Based Monitoring solution for Hayley Engineering Services, enabling real-time data analytics to support predictive maintenance, improve asset performance, and enhance long-term reliability.

Life Sciences
Manufacturing

MedTech Business Optimises Asset Reliability and Reduces Unplanned Downtime

ITI Group implemented a Condition Monitoring solution to help their client, a Global MedTech leader, achieve optimised asset reliability and reduced unplanned downtime.

Warehousing

Global Online Retailer Improves Efficiency and Positions for Continued Success

ITI Group implemented a comprehensive SCADA solution to help their client increase visibility into plant operations to meet both customer and business demands.

How can we help you?

Download Case Study

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form

Find Us

We have sites across the UK and North America

ITI Operations Limited

+44 (0) 1246 437600
[email protected]

Rotherside Road,
Sheffield,
South Yorkshire, S21 4HL

View on Google Maps

ITI Group Inc

+1 (437) 371 2821

33 Bloor St East 5th Floor,
Toronto,
Canada,
M4W 3H1

Get in Touch

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form