Sellafield Magnox Swarf Storage Silo Liquor Level Management

An Independent Hardwired Safety System and separate Control System which monitors and controls the active water in the aging storage facility.

Download Case Study

Sector

Nuclear

As part of a Liquor Activity Reduction (LAR) project aimed at improving the overall safety and reducing risk at the Magnox Swarf Storage Silo (MSSS), ITI Group was contracted by Sellafield’s contractor Nuvia to provide Safety and Control Systems to monitor and control the active water in the aging storage facility.

ITI Group designed, built, commissioned and factory tested, to Sellafield’s exacting requirements, an Independent Hardwired Safety System and separate Control System which strengthened the functionality of the plant, improved its longevity, and supported the Silo Emptying Plant (SEP) operations, ultimately enabling the decommissioning and eventual demolition of the legacy building, for a safer future.

Strengthened Safety

ITI Group designed, built, commissioned and factory tested, to Sellafield’s exacting requirements, an Independent Hardwired Safety System and separate Control System which strengthened the functionality of the plant, improved its longevity, and supported the Silo Emptying Plant (SEP) operations, ultimately enabling the decommissioning and eventual demolition of the legacy building, for a safer future.

The MSSS building at Sellafield stores a substantial legacy of radioactive waste underwater in quiescent conditions, but cannot do so indefinitely. ITI Group’s bespoke independent hardwired safety system monitors the liquor levels inside the compartments, instantly reacting to put the plant into a predefined safe state should a trip or interlock be activated, in order to fulfil the immediate requirement of mitigating risks associated with legacy waste storage.

Tick Icon

Separate safety and control systems that fully integrate with plant operations

Tick Icon

Strengthened functionality and reduced risk

Tick Icon

Designed and built to exacting requirements

Tick Icon

Facilitating client’s long-term decommissioning mission

System Experience and Transformation

ITI Group had previously undertaken a First Extension Liquor Activity Reduction project for the client, who then extended the scope to meet further needs for the original building and to enhance the safety and performance of the plant. This experience, combined with a proven track record of projects at Sellafield, gave the client the confidence that ITI Group would deliver the in-depth design justification, design analysis and panel construction to Sellafield’s exacting standards.

ITI Group then designed, manufactured, tested and supplied replacement panels and a hardwired trip system to retain all existing functionality, in addition to providing the new functionality and additional components to enable the termination of the previous panels.

“We always know we can rely on ITI Group to deliver.”

“They once again provided a solution that fulfils all of Sellafield’s requirements, to our specific time and budget constraints, which is imperative to achieving successful collaborative project delivery.”

Steve Miller – Operations Director, EPC and Programmes, Nuvia Limited

Complete Control

ITI Group’s control solution for the one-of-a-kind facility replicates all the existing functionality, then builds on that to provide further full control of the original building and first extension parts of MSSS.

The bespoke control system performs all the liquor movements including washdown, transfers, pumping and maintenance sequences, and provides operators with a bespoke human-machine interface for real time information connected to the client’s data acquisition monitoring system.

Supporting a Safer Future

Fully future-proofed, the systems are open to reconfiguration to allow second stage waste removals, upon completion of this first stage deployment.

The systems work synonymously with the silo emptying plant retrieval machines to facilitate liquor level management and eventually facilitate the complete removal, repackaging and long-term storage of the radioactive waste. This in turn will allow the eventual demolition of the aging building, allowing Sellafield to complete their mission of fully decommissioning the entire radioactive legacy, for a safer future.

How we’ve helped other businesses like yours

Power & Utilities

Hayley Engineering Services Vibration Alert System

AssetMinder (Part of the ITI Group), implemented a Condition-Based Monitoring solution for Hayley Engineering Services, enabling real-time data analytics to support predictive maintenance, improve asset performance, and enhance long-term reliability.

Life Sciences
Manufacturing

MedTech Business Optimises Asset Reliability and Reduces Unplanned Downtime

ITI Group implemented a Condition Monitoring solution to help their client, a Global MedTech leader, achieve optimised asset reliability and reduced unplanned downtime.

Warehousing

Global Online Retailer Improves Efficiency and Positions for Continued Success

ITI Group implemented a comprehensive SCADA solution to help their client increase visibility into plant operations to meet both customer and business demands.

How can we help you?

Download Case Study

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form

Find Us

We have sites across the UK and North America

ITI Operations Limited

+44 (0) 1246 437600
[email protected]

Rotherside Road,
Sheffield,
South Yorkshire, S21 4HL

View on Google Maps

ITI Group Inc

+1 (437) 371 2821

33 Bloor St East 5th Floor,
Toronto,
Canada,
M4W 3H1

Get in Touch

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form