SSE Storr Lochs Hydroelectric Station Refurb

ITI undertook a full overhaul of the integrated electrical and control systems for Storr Lochs Hydroelectric Power Station on the Isle of Skye, creating a resilient, reliable and upgraded control solution for SSE (formerly Scottish & Southern Energy).

Download Case Study

Sector

Power & Utilities

Solutions

Obsolescence Management

Overview

Built in 1952 to supply electricity to the island community, the Storr Lochs scheme is now an integral part of the national electricity supply network, producing an average of 8 Giga Watt hours of electricity per year.

As part of an overhaul of Storr Lochs by SSE, ITI completed a full upgrade and replacement of the low voltage distribution, protection and control equipment, providing a modern robust platform to support the station’s operation into the foreseeable future.

“The project was completed to a high technical standard”

“We chose Servelec Controls because of their software know-how and technical expertise in control system integration. The project was completed to a high technical standard and we’re confident that the new system will support the plant to efficiently provide energy to the Grid for the next 25 years.”

SSE logo.

Ian Heywood – SSE

The Systems

As the main subcontractor, ITI undertook all of the design, installation and commissioning for all the panels, cabling and software required to upgrade the Storr Lochs systems.

The station houses two turbine generator sets (units), each requiring identical control, power, protection, Main Inlet Valve (MIV) and Automatic Voltage Regulator (AVR) panels. Each unit is controlled by its own Programmable Logic Controller (PLC) and a third controls the station ancillary services. Further panels operate these ancillary services, which include the station battery system, remote telemetry, building ventilation and extraction, winch house, station service change-over, and communications connections between the station, winch house and valve house.

ITI then supplied all spares, cabling, junction boxes and software to complete the installation. ITI programmed and integrated the various hardware and software applications from a variety of different manufacturers, including Allen Bradley, Rockwell, SEL and Voith as specified by SSE, into a single architecture, then carried out all the installation, testing and commissioning to provide a safe, reliable control system to run the Storr Lochs scheme for years to come.

Enhanced Solution

ITI has worked in partnership with SSE to successfully deliver numerous projects. This joint approach has enabled the integration of best practice with operating experience from previous projects to develop and improve project delivery. The integrated electrical and control system at Storr Lochs will benefit from a number of upgraded features:

Tick Icon

Automated station control based on reservoir level

Tick Icon

Visual indication from the HMIs (Human Machine Interface)

Tick Icon

Improved Alarm & Event Monitoring & Data Logging

Tick Icon

Robust remote links back to the central control room at Perth

Benefits

The new control system will provide a reliable, fully automated and user-friendly system to support electricity generation from Storr Lochs for the next 25 years. Designed to standards consistent with other facility upgrade projects across the SSE fleet, it will provide improved control, a commonality of spares and reduce the amount of operator training required.

Ian Heywood Programmes Lead Engineer (C&I) at SSE said: “We chose ITI because of their software know-how and technical expertise in control system integration. The project was completed to a high technical standard and we’re confident that the new system will support the plant to efficiently provide energy to the Grid for the next 25 years.”

How we’ve helped other businesses like yours

Power & Utilities

Hayley Engineering Services Vibration Alert System

AssetMinder (Part of the ITI Group), implemented a Condition-Based Monitoring solution for Hayley Engineering Services, enabling real-time data analytics to support predictive maintenance, improve asset performance, and enhance long-term reliability.

Life Sciences
Manufacturing

MedTech Business Optimises Asset Reliability and Reduces Unplanned Downtime

ITI Group implemented a Condition Monitoring solution to help their client, a Global MedTech leader, achieve optimised asset reliability and reduced unplanned downtime.

Warehousing

Global Online Retailer Improves Efficiency and Positions for Continued Success

ITI Group implemented a comprehensive SCADA solution to help their client increase visibility into plant operations to meet both customer and business demands.

How can we help you?

Download Case Study

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

Find Us

We have sites across the UK and North America

ITI Operations Limited

+44 (0) 1246 437600
enquiries@itigroup.com

Rotherside Road,
Sheffield,
South Yorkshire, S21 4HL

View on Google Maps

ITI Group Inc

+1 (437) 371 2821

33 Bloor St East 5th Floor,
Toronto,
Canada,
M4W 3H1

Get in Touch

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*