Filter case studies by:
All case studies:
Life Sciences – Ignition SCADA
Global Life Sciences client achieves valuable data insight from connected assets for increased competitive advantage with the Ignition SCADA Platform.
Analysing Pump Network MARRS Strategy
Digital Twins assist organisations in the analysis of Maintainability, Availability, Reliability, Resourcing and Spares Strategy (MARRS): the key factors in maximising uptime.
WaterWipes Increased Capacity and Optimised Operations
Global Consumer Packaged Goods client achieves OEE efficiency gains and optimised control of production processes from real-time MES platform.
Remote Control of Electrolysis Plants
ITI Group has been awarded numerous contracts by a large manufacturer of hydrogen energy systems to design, supply and install control systems for various containerised water electrolysis plants located in the UK and overseas.
SSE Storr Lochs Hydroelectric Station Refurb
ITI undertook a full overhaul of the integrated electrical and control systems for Storr Lochs Hydroelectric Power Station on the Isle of Skye, creating a resilient, reliable and upgraded control solution for SSE (formerly Scottish & Southern Energy).
Spirit Energy Morecambe Bay DPPA Platform ESD and FGS Replacement
ITI Group has provided control and safety systems for Centrica’s producing assets for over 25 years and to this day continues to provide ongoing service support and system upgrades to all those assets now operated by Spirit Energy.
EKB Etzel Natural Gas Compression & Transmission
Our client EKB, which is a joint venture made up of oil and gas giants BP, Statoil, Ørsted and Gazprom Germania, operates the Etzel Natural Gas storage facility in North Germany, which imports natural gas from the Bunde Etzel Pipeline (BEP) and/or Norddeutsche Erdgastransversale Pipeline (NETRA).
E.ON Babbage ICSS
Our client, E.ON Ruhrgas, who was at the time of this project new to the oil and gas industry, approached ITI to design, commission and provide support for the integrated control and safety system on the newly developed Babbage platform.
Cadbury’s New Chewing Gum Factory Development
ITI Group used simulation to help Cadbury overcome the typical challenges of planning and building a new factory; ensuring that the equipment selection, rules for operation, staffing levels and production capacity were all in sync with the business plan.
Repsol Sinopec Rotating Equipment
Through a collaborative approach, ITI helped Repsol Sinopec achieve its ambitious “Rotating Equipment Excellence Programme”, which provides early warnings about potential equipment failures, collects and analyses historical data and enables future operational trends to be predicted.
EDF Rod Drop Monitoring
Rod Drop Monitoring Commercial Off-The-Shelf (COTS) System Integration, initially installed at Hinkley Point B, Dungeness and Hunterston B.
EDF Hinkley B AIC SCADA Replacement
The Alternative Indication Centre (AIC) at Hinkley Point B Power Station provides a secondary, remote monitoring facility for post-trip-event reactor conditions, ensuring safe shutdown and maintenance of adequate post-trip cooling and providing a back-up to the Central Control Room.