Marks and Spencer simulation case study

Free download

Proven on facilities at full complexity

Marks and Spencer’s distribution centre

Serious capital risk removed, and the materials-handling design validated before the spend was committed. The client went into implementation knowing the design would perform, with additional functionality and flexibility already designed in to absorb future business change, reducing their future cost-risk exposure.

What made it exceptional was the scale and the interaction: a circa 900,000 sq ft facility, around 150,000 SKUs, thousands of orders an hour, more than sixteen distinct handling sub-systems, and two order channels, national distribution and ecommerce, running through one building. Every scenario was tested against the client’s own operating data, with 3D visualisation that let every stakeholder in the decision see how the facility would behave.

Marks & Spencer logo.

 

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form

Explore more ITI resources

Explore resources

Find Us

We have sites across the UK and North America

ITI Operations Limited

+44 (0) 1246 437600
enquiries@itigroup.com

Rotherside Road,
Sheffield,
South Yorkshire, S21 4HL

View on Google Maps

ITI Group Inc

+1 (437) 371 2821

33 Bloor St East 5th Floor,
Toronto,
Canada,
M4W 3H1

Get in Touch

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form